
New Homes & Renovations · Arakoon 2431
Renovating the beach house? New home and reno electrical in Arakoon.
Opening up walls in an Arakoon house is the best time to plan new power, lights and air con. Bring us in early and it all goes in once, neatly, by one team.
5.0 from 86 Google reviews- Wiring and air con planned together
- Every circuit tested at fit off
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Why Arakoon calls us
Houses made ready for the long stay
Most Arakoon homes are owned outright, and plenty of owners are setting them up for retirement or for longer stays. A new kitchen, a bigger living area or an extension is the moment to add power points where you need them and decide on heating and cooling.
Read more
Choosing early saves cutting into new ceilings later. Ducted can go in while the frame is open, or a split can be sized for one room. Either way, the circuit behind it is planned by the same team.

Common jobs
Build and reno work around Arakoon
Kitchen renovations
Circuits, power points and bench lighting placed to suit the new layout.
Extensions and new rooms
Wiring and air con for the added space, and a look at whether the board can carry it.
New houses from the slab
Power, lights and ducted or split systems planned with you or your builder.
Bathroom updates
Lights and power for a new bathroom, fitted once the walls are lined.
How we fit in with the build
Rough in early, fit off at the end
It starts with the drawings. Caleb reads them through, then meets you or your builder on site to mark out each switch, power point, light and air con head room by room. Only then do you get his price, so it covers what you actually asked for.
Cables and pipes go in while the timber is still bare. After the plasterers finish, we come back to put on the plates, hang the lights and connect the unit. Nothing is called finished until every circuit passes its test and the air con has run in both modes. Our install work is covered for 12 months.

Good to know
Arakoon questions, answered
When should we call you about our Arakoon renovation?
Before the walls close up. It is far easier to plan wiring and air con while the frame is open.
Will you deal with our builder?
Yes. Caleb can liaise with your builder directly, and our stages are booked into the build program ahead of time.
Is it too late for ducted if the roof is already on?
Not always. It is simplest during construction, but a retrofit can work when there is enough room in the ceiling.
Do you handle both trades?
Yes. We do the electrical and the air conditioning on new homes and renovations, as one licensed team.
More in Arakoon
Other jobs we do here
Everything we do in Arakoon · New Homes & Renovations across the coast
Near Arakoon
New Homes & Renovations in nearby towns







