
Switchboards & Safety · Boambee 2450
Board full and still adding? Switchboard upgrades in Boambee.
A long time in one house means a growing list of things on the board. We check yours, explain what it needs and upgrade it so it keeps up.
5.0 from 86 Google reviews- Clear quote once the board is seen
- Signed off when the work is done
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Why Boambee calls us
Boards that have run out of room
Almost half the homes in Boambee are owned outright, and many owners have been there for years. Over that time the shed got power, the air con went in and a workshop followed. The board that came with the house may now be full, with no safety switches.
Read more
Adding outdoor lighting, a shed circuit or a new split all start at the board. Caleb looks at what it runs now and what you are planning, so the upgrade leaves space for the next job too.

Common jobs
Board upgrades in Boambee
Room for new circuits
A board with space for the shed, the lights and the air con.
Safety switches added
Older boards updated with safety switches across the circuits.
Tripping traced
We find out why the power cuts out before pricing the fix.
Ready for air con
A dedicated circuit so a split or ducted system can go on.
On the day
New board, labelled and tested
First, Caleb looks over the board and everything it supplies, from the house to the shed. He explains what he found in plain words, then you get a clear quote before any work is booked.
We swap in the new board, add any circuits you need and label each one so you know what is what. The work is tested and signed off, and installs carry a 12 month warranty. Level 2 work can be arranged with our preferred subcontractor.

Good to know
Boambee questions, answered
My Boambee board has no space left. What now?
Caleb looks at the board and what you want to add, then tells you what an upgrade involves and quotes it.
Can the shed circuit go in at the same time?
Yes. New circuits for the shed, lights or air con can be run as part of the upgrade.
Do I need a new board before getting air con?
Not always. We check the board as part of any air con job, because the unit needs its own circuit.
Who does Level 2 work if it is needed?
Level 2 electrical work can be arranged with our preferred subcontractor, so you still deal with us.
More in Boambee
Other jobs we do here
Everything we do in Boambee · Switchboards & Safety across the coast







