Skip to content
CWSElectrical & Air Conditioning
Illustrative: a low beach house with a timber deck and banksia trees on a quiet Grassy Head street

Switchboards & Safety · Grassy Head 2441

No room on the board for air con? Switchboard upgrades in Grassy Head.

An older beach house board may have no spare spot for a new circuit. Caleb checks it, tells you what it needs, then we upgrade it and test the lot.

5.0 from 86 Google reviews
  • Board looked at before any price
  • Tested and signed off when finished
Extremely professional from the quote to completion of the job. Great communication, turned up on time and a very friendly service. Excellent business +++
Julianne B., Google review

Why Grassy Head calls us

A board from another era

Plenty of older Grassy Head houses still run the board they started with. It may have old fuses, few safety switches and no spare spot for the circuit a split needs.

Read more

When a holiday home sits empty for part of the year, a tripping board can go unnoticed until you arrive. Caleb finds the cause, and the upgrade and any new air con can be one booking.

Illustrative: Caleb mounting a new split system above the bed in a Grassy Head beach house bedroom, the owner beside him
A new split going up.

Common jobs

Board work at Grassy Head

  1. Fuses replaced

    An old fuse board swapped for a modern one with safety switches.

  2. A circuit for the split

    A dedicated circuit added so new air con can go on.

  3. Tripping tracked down

    We find why the power keeps cutting out before quoting a fix.

  4. Ready for a reno

    Extra circuits planned when a beach house is being done up.

How the upgrade runs

Checked, explained, then replaced

Caleb opens up the board and looks at what it runs. He tells you in plain words what is worn out or missing, and you get a clear quote before anything is booked.

On the day we put in the new board and any extra circuits, then test the lot and sign it off. You see which switch does what, and the work carries a 12 month warranty. Any Level 2 work goes through our preferred subcontractor.

Illustrative: Caleb showing a homeowner the old ceramic fuses in his meter box
Old fuses, shown and explained.

Good to know

Grassy Head questions, answered

Do I need a new board before air con goes in?

Not always. Caleb checks the board as part of the air con quote and tells you if it needs work.

What are the signs a board needs replacing?

Power that trips a lot, old ceramic fuses or no room for a new circuit. Caleb confirms it on site.

Can you do the board and the split on one visit?

Yes. CWS is licensed for electrical and air con, so the board, circuit and unit can be one job.

Is the new board under warranty?

Yes. Our installation work is covered for 12 months.

Near Grassy Head

Switchboards & Safety in nearby towns

Free quotes

Is the board in your Grassy Head house due for a look?

Prefer to talk? Call Caleb0475 383 472