Skip to content
CWSElectrical & Air Conditioning
Illustrative: Caleb reading plans spread on the bonnet of the CWS ute, beside a new timber house frame and a green shed on a grassy block

New Homes & Renovations · Kinchela 2440

Building by the river? New home and reno electrical in Kinchela.

Whether it is a new house on the flats or an older family home getting a refresh, the wiring and air con go in best when they are planned before the walls close.

5.0 from 86 Google reviews
  • Power, lights and air con in one plan
  • One team from rough in to fit off
We had an excellent experience with CWS Electrical and Air Conditioning! Caleb and Brodie were incredibly friendly, extremely efficient, and professional throughout. They provided great advice tailored to our needs and were punctual, arriving exactly when they said they would. Their attention to detail and expertise were impressive.
Gillian D., Google review

Why Kinchela calls us

New builds and old family homes

Kinchela is a village of houses, many of them long held by the same families. When one of those homes gets a new kitchen or an extension, it is the moment to add circuits, sort the lighting and settle on air con.

Read more

On a new build, the shed supply and the board size are worth planning from the start too. Ducted can go in while the frame is open, or splits can be sized room by room, with all the wiring done by us.

Illustrative: Caleb feeding orange cable through the timber frame of a new home while the owner, holding rolled plans, talks with him
Cable in before the lining.

Common jobs

Build and reno jobs in Kinchela

  1. Kitchen renovations

    Circuits, power points and bench lighting placed to suit the new layout.

  2. Room additions

    Wiring and air con for extra rooms, with the board checked for the load.

  3. New houses from the slab

    Power, lights and cooling planned with the owner or builder.

  4. Shed supply from day one

    Power to the shed planned with the house, not added years later.

How we work with the build

Two visits that matter most

It starts with the plans. Caleb goes through them with you or your builder and walks the site, so every switch, power point, light and air con unit has a spot. You get a clear quote before work begins.

Our first stage is rough in, while the frame is bare. The second is fit off, once the walls are lined and painted. Between them, every circuit is tested and signed off and any air con is run hot and cold. Installs carry a 12 month warranty.

Illustrative: Caleb going over the floor plan with a builder on the slab of a new home
Plans checked on the slab.

Good to know

Kinchela questions, answered

How early should we call about our Kinchela build?

Before the frame goes up, if you can. It is easier to plan the wiring and ducting while the walls are open.

Can you plan the shed power with the house?

Yes. Caleb looks at the whole block, so the board and cable runs suit the shed as well.

Do you liaise with builders?

Yes. We work with the owner or the builder, and our stages are booked so they get proper time on site.

Can you do the air con too?

Yes. CWS handles electrical and air conditioning on new homes and renovations as one licensed team.

Near Kinchela

New Homes & Renovations in nearby towns

Free quotes

Building or renovating in Kinchela?

Prefer to talk? Call Caleb0475 383 472