Skip to content
CWSElectrical & Air Conditioning
Illustrative: a white weatherboard home on a red brick base with a carport, a flowering bottlebrush and a wide front lawn

New Homes & Renovations · Raleigh 2454

Opening up an older home? New home and reno electrical in Raleigh.

Renovating an older Raleigh house is the right time to fix the wiring, plan the lights and decide on air con. Bring us in early and it all gets done while the walls are open.

5.0 from 86 Google reviews
  • Electrical and air con planned together
  • Lights placed to suit each room
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Jane P., Google review

Why Raleigh calls us

Older houses due for a refresh

Many Raleigh homes were built long before anyone planned for air con or a kitchen full of appliances. When you pull out the old kitchen or add a room out the back, it is the time to bring the wiring and the board up to date.

Read more

Heating and cooling is easier to sort before the walls go back up. Ducted can be laid in during the reno, or a split sized for one room, and the circuits for it go in at the same time by the same team.

Illustrative: Caleb on a stepladder fitting a new downlight in an older kitchen while the homeowner watches
New lights in an old kitchen.

Common jobs

Reno and build work in Raleigh

  1. Kitchen renovations

    New circuits, power points and bench lights where the new kitchen needs them.

  2. Extensions

    Wiring and air con for new rooms, with the board checked for the extra load.

  3. New homes

    Power, lighting and air con planned with the owner or builder from day one.

  4. Board upgrades mid reno

    An older board replaced while the house is already opened up.

How we fit in

Planned early, finished neatly

Caleb looks at the plans and walks the house with you or your builder. Together you settle where the switches, power points, lights and air con belong, and you get a clear quote before work starts.

We rough in while the frame is open and fit off after the walls are lined. Circuits are tested and signed off, the air con is run on cool and heat, and the site is kept tidy. Installs carry a 12 month warranty.

Illustrative: ducting laid out in the roof space of a new home
Ducting in while it is open.

Good to know

Raleigh questions, answered

When should we call you about our Raleigh renovation?

Before the walls close up. Planning the wiring, lighting and air con early keeps the finish neat.

Do you work with builders?

Yes. We talk with the owner or the builder, and the job is booked in so it gets proper time on site.

Can ducted go in during our renovation?

Yes, it can go in during construction, or be retrofitted later if the ceiling space suits.

Will the old board cope with the new rooms?

Caleb checks it when he looks at the plans, and if it needs an upgrade, that can be part of the same job.

Near Raleigh

New Homes & Renovations in nearby towns

Free quotes

Planning a Raleigh renovation or new home?

Prefer to talk? Call Caleb0475 383 472