Skip to content
CWSElectrical & Air Conditioning
Illustrative: a single storey weatherboard home with a long timber deck on a big green lawn, warm light in the windows at dusk

Switchboards & Safety · Fernmount 2454

Shed and house on one tired board? Switchboard upgrades in Fernmount.

On a Fernmount block the house board often feeds the shed, the pump and the house all at once. We check what yours is carrying and upgrade it so it can cope.

5.0 from 86 Google reviews
  • Board looked at before we quote
  • Tested and signed off at the end
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Jane P., Google review

Why Fernmount calls us

One board doing the work of three

Rural homes pile load onto the board over time. A shed gets power, then a second fridge, then a workshop with a compressor. An older board was never meant for all of that, and the first sign is often power that trips for no clear reason.

Read more

If air con is on your list, the board usually needs looking at first, because each new unit wants a circuit of its own. With Caleb licensed for air con as well, the upgrade and the new unit can be one booking.

Illustrative: Caleb pulling a cable drum from the back of the CWS ute on a quiet road beside a wide river, with gum trees and green flats behind
Cable off the ute.

Common jobs

Board work in Fernmount homes

  1. Ceramic fuses out

    An old fuse board replaced with a modern one that has safety switches.

  2. Power for the shed

    A circuit run so the shed no longer leans on a lead from the house.

  3. Trips traced

    We find out what keeps cutting the power before we quote a fix.

  4. Ready for air con

    A dedicated circuit added so a split or ducted unit can go in.

How the upgrade goes

Plain talk, then a proper board

Caleb opens the meter box and looks at the board and everything it runs, from the kitchen to the shed. He tells you what he found in plain words and what the upgrade involves, and you get a clear quote before any work is booked.

On the day we fit the new board, add any circuits you need, and test the lot. We label it, tidy up and show you what each switch controls. Installs carry a 12 month warranty, and Level 2 work can be arranged with our preferred subcontractor.

Illustrative: Caleb showing a homeowner the old ceramic fuses in his meter box
The old fuses explained.

Good to know

Fernmount questions, answered

My Fernmount power trips when the shed is busy. Is it the board?

It could be. Caleb checks the board and what it supplies, then tells you straight what is going on before he quotes.

Can you run a circuit to the shed while you are here?

Yes. New circuits can be added as part of the upgrade, so the shed gets proper power.

Can the air con go in as part of the upgrade?

It can be the same job. CWS is licensed for electrical and air conditioning, so the board, the circuit and the unit stay with one team.

Is a board upgrade covered?

Yes. Our installation work carries a 12 month warranty.

Near Fernmount

Switchboards & Safety in nearby towns

Free quotes

Is your Fernmount board due for a proper look?

Prefer to talk? Call Caleb0475 383 472