Skip to content
CWSElectrical & Air Conditioning
Illustrative: the CWS ute under gum trees beside the Bellinger River in Mylestom, Caleb lifting a ladder off the roof racks

Switchboards & Safety · Mylestom 2454

Power cuts with a full house? Switchboard upgrades in Mylestom.

When every guest runs a split, the kettle and a hair dryer at once, an old board can struggle. We check it, explain what it needs, then upgrade it.

5.0 from 86 Google reviews
  • Safety switches fitted and tested
  • Clear quote after an on site check
I could not be happier with the work performed by CWS. They did what they said they would and when they said they would do it! On top of that, bunch of great people too.
Steve M., Google review

Why Mylestom calls us

Quiet all winter, flat out all summer

A holiday home can sit nearly idle for months, then carry a full house of people. That jump is when an older board shows its age, with breakers tripping or no spare room for a new air con circuit.

Read more

About half the homes here are owned outright, and some still run the board they started with. If yours has old fuses, it is worth a look before the busy season.

Illustrative: the wide Bellinger River at Mylestom with a boat ramp and a small tinnie at dusk
Evening on the Bellinger.

Common jobs

Board work for Mylestom homes

  1. Fuses out, breakers in

    An old ceramic fuse board replaced with a modern one and safety switches.

  2. Circuits for new air con

    A dedicated circuit so each new split can go on without overloading the board.

  3. Tripping traced first

    We find out why the power keeps dropping before we quote a fix.

  4. Outside circuits

    New circuits for deck, path and outdoor shower lights.

How the upgrade goes

Checked, explained, then upgraded

Caleb opens the board and looks at what it runs and how it is coping. He explains what he found in plain words, and you get a clear quote before any work is booked.

If the house is a rental, we can book the upgrade for a week with no guests. We fit the new board, add any circuits, test the work and sign it off. Then we label each switch so the next person knows what it controls. Installs carry a 12 month warranty.

Illustrative: Caleb labelling the circuits on a new switchboard
Every circuit labelled.

Good to know

Mylestom questions, answered

Do I need a new board before adding splits to my Mylestom place?

Not always. Each new unit needs its own circuit, so Caleb checks the board as part of the air con quote and tells you if it needs work.

What are the signs an old board needs replacing?

Power that trips often, old ceramic fuses, or no room for new circuits. Caleb confirms it on site.

Can you do the board and the air con on one booking?

Yes. CWS is licensed for electrical and air conditioning, so both can be one job.

What about Level 2 work on the supply?

Level 2 electrical work can be arranged with our preferred subcontractor, and you still only deal with us.

Near Mylestom

Switchboards & Safety in nearby towns

Free quotes

Is your Mylestom board ready for a full house?

Prefer to talk? Call Caleb0475 383 472