
Switchboards & Safety · Repton 2454
Planning ducted air con? Switchboard upgrades in Repton.
Before a big new load like ducted goes on, the board needs to be up to it. Caleb checks your Repton switchboard first and upgrades it if it needs more room.
5.0 from 86 Google reviews- Board looked at in person before quoting
- Tested and signed off when finished
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Why Repton calls us
Boards that were never meant for air con
A lot of Repton homes have been lived in for decades, and the board in the meter box may be just as old. It was set up for lights and a few power points, not ducted air con, a second fridge and a workshop out the back.
Read more
Any new air con needs a circuit of its own, so the board usually comes up when people plan cooling. Because Caleb is licensed for both trades, the board work and the new unit can be booked together.

Common jobs
Board work we do in Repton
Room for ducted
A dedicated circuit added so a new ducted or split system can go on.
Ceramic fuses gone
Old fuses replaced with a modern board and safety switches.
Power that keeps tripping
The cause found on site before a fix is priced.
Power for the shed
An older board upgraded so it can take a shed or workshop load.
How the upgrade runs
Explained first, labelled at the end
Caleb has more than twenty years in the trade, and he would rather see your board than guess over the phone. He looks at it and everything it runs, explains what he finds, and gives you a clear quote.
On the day we upgrade the board and add the circuits you need, including one for air con if it is coming. Each circuit is labelled, tested and signed off. We tidy up and walk you through it, and the work carries a 12 month warranty.

Good to know
Repton questions, answered
Do I need a new board before ducted goes in?
Not always. Caleb checks the board as part of any air con quote and tells you if it needs work.
What are the signs my Repton board is due?
Old ceramic fuses, power that trips often, or plans for a big new load like air con or a shed.
What if the job needs Level 2 work?
Level 2 electrical work can be arranged with our preferred subcontractor, and you still deal with us.
Can the board and the air con be one booking?
Yes. CWS is licensed for electrical work and air conditioning, so both can be done by the same team.
More in Repton
Other jobs we do here
Everything we do in Repton · Switchboards & Safety across the coast







