Skip to content
CWSElectrical & Air Conditioning
Illustrative: Caleb pulling a cable drum from the CWS ute on a quiet riverside road near Repton with the Bellinger River behind

Switchboards & Safety · Repton 2454

Planning ducted air con? Switchboard upgrades in Repton.

Before a big new load like ducted goes on, the board needs to be up to it. Caleb checks your Repton switchboard first and upgrades it if it needs more room.

5.0 from 86 Google reviews
  • Board looked at in person before quoting
  • Tested and signed off when finished
We have had our air conditioning unit for a week now and it is fantastic. Caleb offers a highly professional service from quote to installation. His follow through is exceptional and we highly recommend him. On the day Caleb and his apprentice Brody worked in extreme conditions to get our job done which we much appreciate.
Jane P., Google review

Why Repton calls us

Boards that were never meant for air con

A lot of Repton homes have been lived in for decades, and the board in the meter box may be just as old. It was set up for lights and a few power points, not ducted air con, a second fridge and a workshop out the back.

Read more

Any new air con needs a circuit of its own, so the board usually comes up when people plan cooling. Because Caleb is licensed for both trades, the board work and the new unit can be booked together.

Illustrative: a single storey Repton home with a timber deck on a big green block, warm light in the windows at dusk
Older home, bigger load.

Common jobs

Board work we do in Repton

  1. Room for ducted

    A dedicated circuit added so a new ducted or split system can go on.

  2. Ceramic fuses gone

    Old fuses replaced with a modern board and safety switches.

  3. Power that keeps tripping

    The cause found on site before a fix is priced.

  4. Power for the shed

    An older board upgraded so it can take a shed or workshop load.

How the upgrade runs

Explained first, labelled at the end

Caleb has more than twenty years in the trade, and he would rather see your board than guess over the phone. He looks at it and everything it runs, explains what he finds, and gives you a clear quote.

On the day we upgrade the board and add the circuits you need, including one for air con if it is coming. Each circuit is labelled, tested and signed off. We tidy up and walk you through it, and the work carries a 12 month warranty.

Illustrative: Caleb labelling the circuits on a new switchboard
Circuits labelled clearly.

Good to know

Repton questions, answered

Do I need a new board before ducted goes in?

Not always. Caleb checks the board as part of any air con quote and tells you if it needs work.

What are the signs my Repton board is due?

Old ceramic fuses, power that trips often, or plans for a big new load like air con or a shed.

What if the job needs Level 2 work?

Level 2 electrical work can be arranged with our preferred subcontractor, and you still deal with us.

Can the board and the air con be one booking?

Yes. CWS is licensed for electrical work and air conditioning, so both can be done by the same team.

Near Repton

Switchboards & Safety in nearby towns

Free quotes

Is your Repton board ready for what comes next?

Prefer to talk? Call Caleb0475 383 472